Specialistic sub-contractor Aarsleff Ground Engineering has completed the installation of foundation piles, for what is said will be the longest railway bridge in Norway.
Read More
Sarens erects wind turbines using Liebherr LR 11000 crawler
Global green and heavy haulage contractor Sarens, took delivery of a new LR 11000 crawler crane from Liebherr earlier in the year. For its first job, the new 1000 tonne crane was assembled at Oostpolder wind farm, which is currently being built to the south of the Dutch port of Eemshaven. Sarens received the order from there to erect Enercon E-136 EP5 wind turbines with a hub height of 155 metres.
Read More